The Aviva Stadium is a sports stadium located in Dublin, Ireland, with a capacity for 51,700 spectators (all seated). It is built on the site of the former Lansdowne Road stadium, which was demolished in 2007, and replacing it as home to its chief tenants: the Irish rugby union team and the Republic of Ireland football team. The decision to redevelop the stadium came after plans for both Stadium Ireland and Eircom Park fell through. Aviva Group Ireland signed a 10-year deal for the naming rights in 2009.
The stadium, located adjacent to Lansdowne Road railway station, officially opened on 14 May 2010. The stadium is Ireland's first, and only, UEFA Elite Stadium and in 2011, it hosted the Europa League Final. It also hosted the inaugural Nations Cup, as well as the regular home fixtures of the national rugby team, national football team and some home fixtures for Leinster Rugby from August 2010 onwards.
Unlike its predecessor, which was solely owned by the Irish Rugby Football Union (IRFU), the current stadium is controlled by the IRFU and the Football Association of Ireland (FAI) through a 50:50 joint venture known as the Lansdowne Road Stadium Development Company (LRSDC). The joint venture has a 60-year lease on the stadium; on expiry the stadium will return to the exclusive ownership of the IRFU.(ref:wikipedia)
Projects Aviva stadium
Location ()
Owner/client type
Contract
Project status
Use & occupancy Entertainment Assembly Facility
Structure
Gross floor area(m2)
Number of Floors 7 floors / 0 basement floors
Maximum height
Project duration :


2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
Project duration
Feasibility
SD+DD
CD
Construction
Operation
Delivery method :
Special requirements : Fesibility :
SD+DD :
CD :
Construction :
FM :

Project Participants
Feasibility SD+DD CD Construction Operate
Architect
BIM Consultant
BIM Modeler
Contractor
Engineer
Facility manager
Owner/Developer
Researcher
Residents/End users
Subcontractor/Fabricator
Others


BIM Uses
Feasibility SD+DD CD Construction Operation
Cost Estimation
Phase Planning
Drawing Generation
Design Authoring
3D Coordination
Digital Fabrication


Technologies used
Feasibility SD+DD CD Construction Operation
Feasibility SD+DD CD Construction Operation
Cost Reduction
Schedule reduction
RFI reduction
ROI
Error reduction
Rework reduction
Waste reduction
Safety improvement
Communication/decision-making improvement
Others: Marketing
References
Overview
Project timeline
Team organization/Team selection
High performance
Sustainability
Energy performance
Commercial strategies (BIM execution strategies)
BIM Excution Plan/BIM Guide
Contract /Delivery methods
Model revision/update strategy
Model (information) quality checking methods
Leadership strategies
Team building and collaborative culture
Goals and alignment
Role definition and accountability
Logistical process tactics
Managing schedule and budget
BIM and design documantation
Meeting and workspace environment
Building innovation
Emerging technologies