Louis Vuitton Fondation

NO IMAGE : Please register the image of the project.
The building of the Louis Vuitton Foundation (previously Louis Vuitton Foundation for Creation, in French "Fondation Louis-Vuitton pour la création"), started in 2006, is an art museum and cultural center sponsored by the group LVMH and its subsidiaries but run as a legally separate, nonprofit entity as part of its promotion of art and culture. The $143 million museum in Paris has recently been completed and is opened in October 2014. The new building was designed by the architect Frank Gehry, and is adjacent to the Jardin d'Acclimatation in the Bois de Boulogne of the 16th arrondissement of Paris.
(ref: wikipedia)
Projects Louis Vuitton Fondation
Location ()
Owner/client type
Contract
Project status
Use & occupancy Museum
Structure
Gross floor area(m2)
Number of Floors 2 floors / 0 basement floors
Maximum height
Project duration :


2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Project duration
Feasibility
SD+DD
CD
Construction
Operation
Delivery method :
Special requirements : Fesibility :
SD+DD :
CD :
Construction :
FM :

Project Participants
Feasibility SD+DD CD Construction Operate
Architect
BIM Consultant
BIM Modeler
Contractor
Engineer
Facility manager
Owner/Developer
Researcher
Residents/End users
Subcontractor/Fabricator
Others


BIM Uses
Feasibility SD+DD CD Construction Operation
Drawing Generation
Design Authoring
Structural Analysis
Other Engineering Analysis
3D Coordination


Technologies used
Feasibility SD+DD CD Construction Operation
Feasibility SD+DD CD Construction Operation
Cost Reduction
Schedule reduction
RFI reduction
ROI
Error reduction
Rework reduction
Waste reduction
Safety improvement
Communication/decision-making improvement
Others: Marketing
References Archdaily wikipedia
Overview
Project timeline
Team organization/Team selection
High performance
Sustainability
Energy performance
Commercial strategies (BIM execution strategies)
BIM Excution Plan/BIM Guide
Contract /Delivery methods
Model revision/update strategy
Model (information) quality checking methods
Leadership strategies
Team building and collaborative culture
Goals and alignment
Role definition and accountability
Logistical process tactics
Managing schedule and budget
BIM and design documantation
Meeting and workspace environment
Building innovation
Emerging technologies