Green Smart Building Project

NO IMAGE : Please register the image of the project.
The Green Smart Building project is an experimental project for intelligent research and development composed of energy savings, low-carbon emissions, and IT technology. This project aims to secure a research infrastructure that conducts R&D and demonstrative works, as well as to build a cooperative system that applies the core technologies of BIM to the whole process from design to facility management. The key point of the BIM application is to create a detailed BIM execution plan and set up a goal in accordance with the work procedure. Suitable LOD-setting for the design cooperation of a BIM model reduces unnecessary documentation time and enhances understanding through a 3D BIM model. In addition, it had the advantage of making an effective decision with overseas companies as well as of reviewing the facade and space program. In addition, Hyundai Architects & Engineers Associates (HDA) instituted HI-BIMS to establish the consistent use of BIM throughout the concept, design, and construction phases and to improve efficiency.
(ref: The BIM Issue 12)
Projects Green Smart Building Project
Location ()
Owner/client type
Contract
Project status
Use & occupancy Scientific Research and Development Facility
Structure
Gross floor area(m2)
Number of Floors 4 floors / 0 basement floors
Maximum height
Project duration :


Project duration
Feasibility
SD+DD
CD
Construction
Operation
Delivery method :
Special requirements : Fesibility :
SD+DD :
CD :
Construction :
FM :

Project Participants
Feasibility SD+DD CD Construction Operate
Architect
BIM Consultant
BIM Modeler
Contractor
Engineer
Facility manager
Owner/Developer
Researcher
Residents/End users
Subcontractor/Fabricator
Others


BIM Uses
Feasibility SD+DD CD Construction Operation
Drawing Generation
Design Reviews
Design Authoring
Energy Analysis
3D Coordination
3D Control and Planning


Technologies used
Feasibility SD+DD CD Construction Operation
Feasibility SD+DD CD Construction Operation
Cost Reduction
Schedule reduction
RFI reduction
ROI
Error reduction
Rework reduction
Waste reduction
Safety improvement
Communication/decision-making improvement
Others: Marketing
References The BIM Issue 12 현대건설 그린스마트빌딩의 설계 및 시공 전략
Overview
Project timeline
Team organization/Team selection
High performance
Sustainability
Energy performance
Commercial strategies (BIM execution strategies)
BIM Excution Plan/BIM Guide
Contract /Delivery methods
Model revision/update strategy
Model (information) quality checking methods
Leadership strategies
Team building and collaborative culture
Goals and alignment
Role definition and accountability
Logistical process tactics
Managing schedule and budget
BIM and design documantation
Meeting and workspace environment
Building innovation
Emerging technologies