The Place, London Bridge Quarter

NO IMAGE : Please register the image of the project.
Located at the heart of London Bridge Quarter, The Place has direct access to a new piazza and the extensive transport connections at London Bridge Station.
WSP is the project co-ordinator and BIM consultant as well as providing multidisciplinary engineering consultancy, including structural, MEP, ground engineering and environmental services. The project is currently under construction.
The building information model is a virtual model of the buildings architectural, structural and MEP systems, and includes a database of asset properties. The building model assists in clash detection, co-ordination, cost estimation and construction sequencing. BIM will be further developed throughout construction providing as-built information from the contractors. The model will ultimately serve as a tool for the client after construction, in operational mode for asset and facilities management.
Projects The Place, London Bridge Quarter
Location ()
Owner/client type
Contract
Project status
Use & occupancy Office Building
Structure
Gross floor area(m2)
Number of Floors 21 floors / 0 basement floors
Maximum height
Project duration :


Project duration
Feasibility
SD+DD
CD
Construction
Operation
Delivery method :
Special requirements : Fesibility :
SD+DD :
CD :
Construction :
FM :

Project Participants
Feasibility SD+DD CD Construction Operate
Architect
BIM Consultant
BIM Modeler
Contractor
Engineer
Facility manager
Owner/Developer
Researcher
Residents/End users
Subcontractor/Fabricator
Others


BIM Uses
Feasibility SD+DD CD Construction Operation
Drawing Generation
Design Reviews
Structural Analysis
3D Coordination
Digital Fabrication
Space Management/Tracking


Technologies used
Feasibility SD+DD CD Construction Operation
Feasibility SD+DD CD Construction Operation
Cost Reduction
Schedule reduction
RFI reduction
ROI
Error reduction
Rework reduction
Waste reduction
Safety improvement
Communication/decision-making improvement
Others: Marketing
References the BIM Hub WSP (Parsons Brinckerhoff) Building.co.uk JCT (The Joint Contracts Tribunal)
Overview
Project timeline
Team organization/Team selection
High performance
Sustainability
Energy performance
Commercial strategies (BIM execution strategies)
BIM Excution Plan/BIM Guide
Contract /Delivery methods
Model revision/update strategy
Model (information) quality checking methods
Leadership strategies
Team building and collaborative culture
Goals and alignment
Role definition and accountability
Logistical process tactics
Managing schedule and budget
BIM and design documantation
Meeting and workspace environment
Building innovation
Emerging technologies