CSP steel plant

NO IMAGE : Please register the image of the project.
Saving time by finding design errors

POSCO E&C applied BIM to four facilities of this project; Central Maintenance Shop, Raw Material Test Center, Chemical Analysis Center and Raw Water Treatment facility. They were able to build them all on schedule. They saved a large amount of time on rework and fixing issues on site by coordinating their design before construction with Tekla BIMsight.

Regarding the Central Maintenance Shop, POSCO E&C saved approximately 15% in rework by preventing errors before construction was started. The scheduled construction period was 627 days, and by using TeklaBIMsight, they were able to finish the project on time by finding 99 errors in advance. If they were unable to detect and prevent those errors, the project would have taken an estimated 94 extra days. As for the other three facilities, the savings in time were: 2% in the Raw Material Test Center, 8% in the Chemical Analysis Center, and 32% in the Raw Water Treatment Facility.
Projects CSP steel plant
Location ()
Owner/client type
Contract
Project status
Use & occupancy Manufacturing Facility
Structure
Gross floor area(m2)
Number of Floors 0 floors / 0 basement floors
Maximum height
Project duration :


2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Project duration
Feasibility
SD+DD
CD
Construction
Operation
Delivery method :
Special requirements : Fesibility :
SD+DD :
CD :
Construction :
FM :

Project Participants
Feasibility SD+DD CD Construction Operate
Architect
BIM Consultant
BIM Modeler
Contractor
Engineer
Facility manager
Owner/Developer
Researcher
Residents/End users
Subcontractor/Fabricator
Others


BIM Uses
Feasibility SD+DD CD Construction Operation


Technologies used
Feasibility SD+DD CD Construction Operation
Feasibility SD+DD CD Construction Operation
Cost Reduction
Schedule reduction
RFI reduction
ROI
Error reduction
Rework reduction
Waste reduction
Safety improvement
Communication/decision-making improvement
Others: Marketing
References https://www.teklabimsight.com/references/speedy-work-and-error-free-design-huge-project-simple-tool
Overview
Project timeline
Team organization/Team selection
High performance
Sustainability
Energy performance
Commercial strategies (BIM execution strategies)
BIM Excution Plan/BIM Guide
Contract /Delivery methods
Model revision/update strategy
Model (information) quality checking methods
Leadership strategies
Team building and collaborative culture
Goals and alignment
Role definition and accountability
Logistical process tactics
Managing schedule and budget
BIM and design documantation
Meeting and workspace environment
Building innovation
Emerging technologies