National Route N3 - New Van Reenen's Pass

NO IMAGE : Please register the image of the project.
The project was then transferred onto a Civil BIM platform, Civil 3D to facilitate the design to visualisation process. This involved a number of technical challenges, requiring careful planning at the outset. The processed aerial survey model which contained over 5 million points was further optimised by limiting full detail to the design corridor and degrading the point density outwards. The planned route was broken up into four sections, each referencing a common geometric alignment, to optimise performance whilst maintaining a dynamic design relationship.
Projects National Route N3 - New Van Reenen's Pass
Location ()
Owner/client type
Contract
Project status
Use & occupancy Highway
Structure
Gross floor area(m2)
Number of Floors 0 floors / 0 basement floors
Maximum height
Project duration :


2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
Project duration
Feasibility
SD+DD
CD
Construction
Operation
Delivery method :
Special requirements : Fesibility :
SD+DD :
CD :
Construction :
FM :

Project Participants
Feasibility SD+DD CD Construction Operate
Architect
BIM Consultant
BIM Modeler
Contractor
Engineer
Facility manager
Owner/Developer
Researcher
Residents/End users
Subcontractor/Fabricator
Others


BIM Uses
Feasibility SD+DD CD Construction Operation
Cost Estimation
Site Analysis
Drawing Generation
3D Coordination


Technologies used
Feasibility SD+DD CD Construction Operation
Feasibility SD+DD CD Construction Operation
Cost Reduction
Schedule reduction
RFI reduction
ROI
Error reduction
Rework reduction
Waste reduction
Safety improvement
Communication/decision-making improvement
Others: Marketing
References the BIM Hub NATIONAL ROUTE N3 – NEW VAN REENEN’S PASS archive.com Solutions - WSP
Overview
Project timeline
Team organization/Team selection
High performance
Sustainability
Energy performance
Commercial strategies (BIM execution strategies)
BIM Excution Plan/BIM Guide
Contract /Delivery methods
Model revision/update strategy
Model (information) quality checking methods
Leadership strategies
Team building and collaborative culture
Goals and alignment
Role definition and accountability
Logistical process tactics
Managing schedule and budget
BIM and design documantation
Meeting and workspace environment
Building innovation
Emerging technologies